Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project as a whole includes improvements to the main pump station. Improvements include demolition of existing building, equipment, HVAC, electrical, controls, Scada equipment, lighting, plumbing, and concrete and replacement of electrical, controls, HVAC, Scada equipment, lighting, and plumbing. The project also includes installation of concrete, access hatches, and all related work. Owner will be performing tree removal and fence replacement during the construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableDemolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
AvailableThe work consist of approx 1 LS selective demolition of floors, walls and concrete pads; 3 EA exterior concrete aprons; 1 LS cutting and patching existing ballasted roofing system; 1 LS fall- protection system for roof; 1 LS minisplit heating and cooling system; 2 EA gravity vents; 1 LS controls.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
The work consist of approx 1 LS selective demolition of floors, walls and concrete pads; 3 EA exterior concrete aprons; 1 LS cutting and patching existing ballasted roofing system; 1 LS fall- protection system for roof; 1 LS minisplit heating and cooling system; 2 EA gravity vents; 1 LS controls.
AvailableProcurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis