Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new Well #2 Pump Station including a new CMU building, two new pumps, and all related site and electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableReplacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Replacement of pump instrumentation, air relief valves, hydropneumatic air compressor, motor control center (MCC), main switch board (MSB), electrical services meter main, harmonic filters, variable frequency drives (VFDs), and ductile iron piping; coating rehabilitation, installation of safety features for underground vault accessibility, site pavement reconstruction, and sewer manhole improvements.
AvailableProcurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
AvailableWater well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Posted Date
Dec 15, 2025
Due Date
Jan 27, 2026
Release: Dec 15, 2025
Close: Jan 27, 2026
Water well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.