Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 70 LF of temporary slit fence (with backing); 40 TN mineral aggregate base; 15 TN asphalt concrete mix (PG64-22) (BPMB-HM); grading B-M2; 20 TN asphalt concrete mix(PG64-22) (BPMB-HM) grading E; retaining wall (redi-rock wall); 15 EA flexible drums (channelizing). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Ohio Turnpike and Infrastructure Commission is soliciting bids for Eastbound slope repair at Milepost 222.35 in Mahoning County, Ohio (Project No. 70-26-01). The project entails slope stabilization/repair work along the eastbound mainline of the Ohio Turnpike. Bids are due January 15, 2026 via the Bid Express portal.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
The Ohio Turnpike and Infrastructure Commission is soliciting bids for Eastbound slope repair at Milepost 222.35 in Mahoning County, Ohio (Project No. 70-26-01). The project entails slope stabilization/repair work along the eastbound mainline of the Ohio Turnpike. Bids are due January 15, 2026 via the Bid Express portal.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
AvailableWork includes 80 CY regular excavation, 1 EA inlet protection type a, 200 CY borrow excavation, 616 ton aggr. Base matl. Ty. I no. 21b, 330 ton asphalt concrete ty. Sm-12. 5a const, 347 ton asphalt concrete bm-25. 0, 2 CY concrete class a3 misc., 16 LF handrail hr-1 type I, 1 EA guardrail end anchorage gr-mgs3, 12. 5 LF guardrail terminal gr-6 nchrp 350, 1 EA adjust exist. Valve & box. See outside link.
Posted Date
Nov 21, 2025
Due Date
Jan 14, 2026
Release: Nov 21, 2025
Close: Jan 14, 2026
Work includes 80 CY regular excavation, 1 EA inlet protection type a, 200 CY borrow excavation, 616 ton aggr. Base matl. Ty. I no. 21b, 330 ton asphalt concrete ty. Sm-12. 5a const, 347 ton asphalt concrete bm-25. 0, 2 CY concrete class a3 misc., 16 LF handrail hr-1 type I, 1 EA guardrail end anchorage gr-mgs3, 12. 5 LF guardrail terminal gr-6 nchrp 350, 1 EA adjust exist. Valve & box. See outside link.
AvailableThis project consists of, but is not limited to: The Road Plymouth Switchbacks Repair and Clean Water Project consists of repairing and upgrading the eastern 1.95 miles of the Road, a State Forest Highway. The road serves as important access to Coolidge West State Forest for recreation and forest management activities as well as a valued travel corridor over the Green Mountains between the towns.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
This project consists of, but is not limited to: The Road Plymouth Switchbacks Repair and Clean Water Project consists of repairing and upgrading the eastern 1.95 miles of the Road, a State Forest Highway. The road serves as important access to Coolidge West State Forest for recreation and forest management activities as well as a valued travel corridor over the Green Mountains between the towns.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →