Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Ohio Turnpike and Infrastructure Commission is soliciting bids for Eastbound slope repair at Milepost 222.35 in Mahoning County, Ohio (Project No. 70-26-01). The project entails slope stabilization/repair work along the eastbound mainline of the Ohio Turnpike. Bids are due January 15, 2026 via the Bid Express portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 5,900 CY excavation embankment; 20,000 SF cofferdams and excavation bracing; 2,988 LF 36" drilled shaft; 405 LF 8" conduit; 8,765 SY seeding and mulching class 2; 1 LS clearing and grubbing. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Work includes approx 5,900 CY excavation embankment; 20,000 SF cofferdams and excavation bracing; 2,988 LF 36" drilled shaft; 405 LF 8" conduit; 8,765 SY seeding and mulching class 2; 1 LS clearing and grubbing. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Project consist of 3,090 CY earthwork, 441 LF PCC trapezoidal channel, 60 LF PCC V-ditch down drain, 30,000 SF hydroseed, 100 LF abandon existing 18" storm drain. See outside link.
AvailableThe Riverside County Transportation Commission seeks Statements of Qualifications for a progressive design‑build contract to add an operational lane on eastbound SR‑91 from the SR‑241 general purpose connector to the SR‑71 connector auxiliary lane near the Green River Road Overcrossing. Procurement is two‑step, beginning with qualification‑based SOQs due by January 20, 2026 at 12:00 p.m. PST.
Posted Date
Nov 13, 2025
Due Date
Jan 20, 2026
Release: Nov 13, 2025
Close: Jan 20, 2026
The Riverside County Transportation Commission seeks Statements of Qualifications for a progressive design‑build contract to add an operational lane on eastbound SR‑91 from the SR‑241 general purpose connector to the SR‑71 connector auxiliary lane near the Green River Road Overcrossing. Procurement is two‑step, beginning with qualification‑based SOQs due by January 20, 2026 at 12:00 p.m. PST.
AvailableThe Riverside County Transportation Commission seeks Statements of Qualifications for a progressive design‑build contract to add an operational lane on eastbound SR‑91 from the SR‑241 general purpose connector to the SR‑71 connector auxiliary lane near the Green River Road Overcrossing. Procurement is two‑step, beginning with qualification‑based SOQs due by January 20, 2026 at 12:00 p.m. PST.
Posted Date
Nov 13, 2025
Due Date
Jan 20, 2026
Release: Nov 13, 2025
Close: Jan 20, 2026
The Riverside County Transportation Commission seeks Statements of Qualifications for a progressive design‑build contract to add an operational lane on eastbound SR‑91 from the SR‑241 general purpose connector to the SR‑71 connector auxiliary lane near the Green River Road Overcrossing. Procurement is two‑step, beginning with qualification‑based SOQs due by January 20, 2026 at 12:00 p.m. PST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →