Description: Work includes 1 LS remove and dispose of existing lift station (dry pit structure, wetwell, top slab, pump, motor, piping, valves, byppass connection fittings); 100 LF remove and dispose of gravity sewer piping; 215 SY remove and dispose existing sod; 820 SY remove and dispose of existing asphalt pavement; 415 SY mill 1" of existing asphalt pavement; 1 EA furnish and install pre case manhole structure; 1 EA core new manhole and connection existing gravity main. See attached file.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
2 files available
Board meeting
323 days before RFP
Director Alan Dodd reported a five-year plan to replace nine of twelve lift stations, funded 20% by the Wastewater Utility Fund and 80% by WIFIA.
See sourceHide source
Director Dodd reviewed projects planned over the next five years, which include: • Replacing 9 of 12 lift stations • Replacing or rehabilitating roughly 50% of the City's force mains and 10% of high-risk or below-capacity gravity mains Director Dodd explained that the City will pay for 20% of the projects through its Wastewater Utility Fund and will use…
City Commission Of The City Of Wilton Manors Regular City Commission Meeting
The proposed utility capital plan lists Lift Station No. 5 electrical, pumps and force-main replacement with $598,600 from proposed WIFIA funding and $149,600 in City-funded amounts.
See sourceHide source
Exhibit 12: Water and Wastewater Capital Improvement Plan Projects and Funding Sources Total Description Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2025 - FY 2030 Funding Sources Water Rate Revenue W - Rates $1,027,900 $2,061,500 $1,238,300 $2,973,600 $3,785,100 $1,640,500 $12,726,900 Sewer Rate Revenue S - Rates 701,700 19,300…
Board meeting
50 days before RFP
The City Commission approved Resolution 2026-057, endorsing the Lift Station No. 5 relocation and flood-resilience grant application and committing a 50-percent City cost share.
See 2 sourcesHide sources
Resolution No. 2026-057: (Emergency Management / Utilities) A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF WILTON MANORS, FLORIDA, ENDORSING THE CITY'S APPLICATION TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR A RESILIENT FLORIDA IMPLEMENTATION GRANT FOR THE LIFT STATION NO. 5 RELOCATION AND FLOOD RESILIENCE PROJECT; APPROVING AND COMMITTING…
Agenda packet
50 days before RFP
The City reported completed final design and obtained all necessary permits for the Lift Station No. 5 relocation and replacement.
See sourceHide source
C. Status of project design\* Project design status Design is complete -- see "i" icon for more information If yes, explain.\* Final signed and sealed construction plans for the relocation and replacement of Lift Station No. 5 were completed on February 26, 2026. The completed design includes the new wet well, valve and meter vaults, duplex submersible…
The project will relocate and replace Lift Station No. 5 with a new wet well, valve and meter vaults, duplex submersible pumps and a spare pump, electrical and control systems, redirected gravity sewer, force-main improvements, and associated roadway and site restoration. The improvements will provide approximately 1.08 million gallons per day of wastewater…
City Commission Of The City Of Wilton Manors Regular City Commission Meeting
work consist of 250 sy of of remove and dispose of existing asphalt pavement, 70 sy of mill 1" of existing asphalt pavement, remove and dispose of existing electrical services, 10 lf of remove and dispose of gravity sewer piping, 100 lf of remove and dispose of existing gravity sewer piping, remove and dispose of existing RTU antenna and components, 1 ea of convert existing wet well into manhole, 1 ea of core existing manhole and connect gravity main, 112 lf of furnish and install 8" SDR26 gravity sewer main, 1 ea of furnish and install precast concrete 6' dia wet well with access hatch. See attached file.
Work includes 1 LS removal and disposal of existing gravel, concrete pavement, bituminous pavement and topsoil; 1 LS furnish, operate and maintain temporary bypass pumping facilities; 1 al removal, hauling and disposal of the all liquid and solids content within existing lift station wet well; 1 LS demolition of existing lift station; 100 SF spalling and hollow concrete repair of existing concrete surfaces; 1,350 SF shotcrete wall repair in existing wet well area; 60 LF furnish and install 24" dia pvc gravity sewer service (all depths) ; 60 LF furnish and install 30" dia pvc gravity sewer service (all depths). See attached file.
Replacement of the Bayliss Lift Station Control Panel and related electrical, instrumentation and control, sitework replacement, surface restoration, and ancillary work..
Work includes 1 LS lift station w-27 upgrades; 1 LS furnish and deliver generator; 1 LS bypass pumping; 85 LF cctv 48" sanitary sewer; 85 LF cipp lining 48" sanitary sewer; 1 LS reconnect rotary park lift station to existing system; 1,600 LF furnish and install 20" ductile iron force main; 30,000 pounds furnish and install ductile iron fittings; 2 EA furnish and install 20" plug valves; 5 EA furnish and install combination air valve assemblies in vaults; 500 LF restrain existing 48" force main; 2,500 LF cap, grout and abandon existing 10", 12" and 20" force mains. See attached file.