CityFL
Posted
Oct 22, 2026
Nov 23, 2026
Lift Station No. 7 Replacement RFP
work consist of 250 sy of of remove and dispose of existing asphalt pavement, 70 sy of mill 1" of existing asphalt pavement, remove and dispose of existing electrical services, 10 lf of remove and dispose of gravity sewer piping, 100 lf of remove and dispose of existing gravity sewer piping, remove and dispose of existing RTU antenna and components, 1 ea of convert existing wet well into manhole, 1 ea of core existing manhole and connect gravity main, 112 lf of furnish and install 8" SDR26 gravity sewer main, 1 ea of furnish and install precast concrete 6' dia wet well with access hatch. See attached file.
