Open RFP

Lift Station No. 85 Replacement RFP

Description: Work includes 1 LS removal and disposal of existing gravel, concrete pavement, bituminous pavement and topsoil; 1 LS furnish, operate and maintain temporary bypass pumping facilities; 1 al removal, hauling and disposal of the all liquid and solids content within existing lift station wet well; 1 LS demolition of existing lift station; 100 SF spalling and hollow concrete repair of existing concrete surfaces; 1,350 SF shotcrete wall repair in existing wet well area; 60 LF furnish and install 24" dia pvc gravity sewer service (all depths) ; 60 LF furnish and install 30" dia pvc gravity sewer service (all depths). See attached file.

Buyer
City of Orlando

City · FL, US

Released
Oct 26, 2026
Closes
Dec 4, 2026(36 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts