Lift Station No. 5 Replacement RFP
Work includes 1 LS remove and dispose of existing lift station (dry pit structure, wetwell, top slab, pump, motor, piping, valves, byppass connection fittings); 100 LF remove and dispose of gravity sewer piping; 215 SY remove and dispose existing sod; 820 SY remove and dispose of existing asphalt pavement; 415 SY mill 1" of existing asphalt pavement; 1 EA furnish and install pre case manhole structure; 1 EA core new manhole and connection existing gravity main. See attached file.