Village of Mcarthur - Lift Station & Force Main Replacement - 2026 RFP
Work includes lift station & force main replacement.
Description: Work includes 1 LS lift station w-27 upgrades; 1 LS furnish and deliver generator; 1 LS bypass pumping; 85 LF cctv 48" sanitary sewer; 85 LF cipp lining 48" sanitary sewer; 1 LS reconnect rotary park lift station to existing system; 1,600 LF furnish and install 20" ductile iron force main; 30,000 pounds furnish and install ductile iron fittings; 2 EA furnish and install 20" plug valves; 5 EA furnish and install combination air valve assemblies in vaults; 500 LF restrain existing 48" force main; 2,500 LF cap, grout and abandon existing 10", 12" and 20" force mains. See attached file.
City · FL, US
Adjacent opportunities open for bidding right now.
CityOH
Posted
Oct 14, 2026
Nov 4, 2026
Work includes lift station & force main replacement.
CityGA
Posted
Aug 11, 2026
Nov 5, 2026
The work consists of the installation and construction of one sanitary sewage lift station, installation of about 3,800 LF of sewer force main, and other demolition, repair and patching, grading, grassing, and all related work. 35 SY 6" concrete driveway, 200 LF 8" HDPE sanitary sewer force main. Lift Station Site Complete - all work inside and including header curb including concrete wet well, pumps, piping, fencing, drive, gravel, header curb, light pole, bollards, electrical panel and wiring, generator, SS-1 manhole, etc. 20 LF 2" PE water line, 1 LS landscaping drip irrigation system, 450 SY sod.
CountyFL
Posted
Oct 9, 2026
Nov 20, 2026
Work will extend the 12” LS 9-A force main from the intersection approximately 1,250' to the king manhole of LS14-A. King manhole #12208 to be replaced with new polymer concrete manhole and associated connections and grout approximately 40' and remove existing manhole.
Indigenous GovernmentNM
Posted
Oct 4, 2026
Nov 19, 2026
Work consists of installation of new sewer force main from the main village lift station to the lift station, including open-trench and horizontal directional drill installation, wet well rehabilitation, valve vault replacement, electrical improvements, bypass connection, and associated force main connections. This work includes approx 9,668 LF of 6: HDPE C-906 DR-17 force main installed using open-trench construction methods, along with an additional 1,084 LF of HDPE C-906 DR-11 installed via horizontal directional drilling (HDD), removal and replacement of the concrete valve vault and associated components; electrical improvements; installation of a bypass quick-connect to the existing 6-inch force main serving the Main Village Lagoons; and a force main connection to a 45-degree wye at the end of the alignment.
Decision makers connected to this RFP from City of Hollywood.
Solicitation files and supporting documents for this bid.