Main Village Trunk Sewer Line Improvements Phase 2 RFP
Posted
Nov 1, 2026
Nov 30, 2026
The Project includes Open trench installation approx. 5,000 LF of 8" gravity sewer line including new manholes, new terminal cleanouts, sewer services for approx. 42 existing residences or lots, abandonment of approx. 12 existing manholes, and connections to existing sewer lines. Jack and bore crossings of two irrigation canals and BIA Southern Pueblos Route 88 (SP 88)/ Tano Street with 8" carrier pipe. Approx. 150 LF of pipe bursting of an existing 8" vitrified clay pipe with 10" HDPE SDR 17 pipe. Two bid alternates, one substitutive for HDPE casing instead of steel and one additive to abandon in place an existing septic tank.