Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mescalero Apache Tribe
Upsize water main and gate valves and replace galvanized iron and asbestos cement pipes with new PVC water main. Abandon existing water main in place. At NMDOT crossings, cut, pressure grout, and cap. 500 LF of new 4" PVC water main including fittings and 8 gate valves and boxes 34,700 LF of new 6" PVC water main including fittings and 118 gate valves and boxes 17,200 LF of new 8" PVC water main including fittings and 50 gate valves and boxes 700 LF of new 10" PVC water main including fittings and 2 gate valves and boxes Install 2 altitude valves including bypass and vault Install 41 new fire hydrant assemblies and nine (9) new 2" flush hydrant assemblies Replace 28 existing fire hydrant assemblies and five (5) 2" flush hydrant assemblies.
Posted Date
Jul 22, 2025
Due Date
Aug 28, 2025
Release: Jul 22, 2025
Mescalero Apache Tribe
Close: Aug 28, 2025
Upsize water main and gate valves and replace galvanized iron and asbestos cement pipes with new PVC water main. Abandon existing water main in place. At NMDOT crossings, cut, pressure grout, and cap. 500 LF of new 4" PVC water main including fittings and 8 gate valves and boxes 34,700 LF of new 6" PVC water main including fittings and 118 gate valves and boxes 17,200 LF of new 8" PVC water main including fittings and 50 gate valves and boxes 700 LF of new 10" PVC water main including fittings and 2 gate valves and boxes Install 2 altitude valves including bypass and vault Install 41 new fire hydrant assemblies and nine (9) new 2" flush hydrant assemblies Replace 28 existing fire hydrant assemblies and five (5) 2" flush hydrant assemblies.
Mescalero Apache Tribe
Construction of a new 240,000-gallon ground-mounted welded steel storage tank and miscellaneous site improvements.
Posted Date
Jul 22, 2025
Due Date
Aug 28, 2025
Release: Jul 22, 2025
Mescalero Apache Tribe
Close: Aug 28, 2025
Construction of a new 240,000-gallon ground-mounted welded steel storage tank and miscellaneous site improvements.
Mescalero Apache Tribe
Replace roofs on units - replacement of roofs from shingles to metal roofing.
Posted Date
Mar 25, 2025
Due Date
Apr 7, 2025
Release: Mar 25, 2025
Mescalero Apache Tribe
Close: Apr 7, 2025
Replace roofs on units - replacement of roofs from shingles to metal roofing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Mescalero Apache Tribe's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database