Project is comprised of full-depth concrete pavement panel replacement and partial reconstruction with storm structure rehabilitation work.
City of Pocola
Street improvements. Work includes roll shoulders; pulverize existing pavement to existing base and haul offsite; 6" aggretate base (SB-2), water and compact existing base; tack coat; compacted virgin asphalt - final thickness 3".
City of Lincoln
The project will include capacity improvements associated with the Lincoln Wastewater System (LWWS) Theresa Street Water Resource Recovery Facility (TSWRRF). The project consists of constructing two new aeration basins, two new final clarifiers, a new non-potable water system building, a new primary power substation, and new RAS pump(s). Other anticipated improvements include modifications to the aeration control system in two existing aeration basins, replacement of one existing aeration blower, site piping, electrical distribution, earthwork, pavement, and associated appurtenances as required by the project. Scopes of Work Bidding currently as part of Bid Package No. 03: Landscaping. See attached file.
Perry County
Street improvements services.
Village of Bolivar
This project includes infrastructure improvements to replace water main and water services, sewer main spot repairs, sewer main lining, sewer lateral replacement, manhole lining, and storm drainage including road restoration on olive street in the village of bolivar.