CityVT
Aug 12, 2026
Closes
Aug 27, 2026
Clarifiers Rehabilitation Project
The contract generally includes the following work items at the Water Resource Recovery Facility located at 35 Cascade Street in the City of Essex Junction: Primary Clarifier #1 • All steel in immersion including walls, rake arms and any miscellaneous piping. This does not include the steel-effluent channels. • Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. ADD ALTERNATE A • Add all atmospheric steel on Primary Clarifier #1. See Specification Section (2.02.B.) Secondary Clarifier #1 • All steel in immersion including drum, rake arms and any miscellaneous piping.