Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Looking for safe removal, disposal, and replacement of the facility’s existing MCC. The project includes disconnecting, removing, and disposing of the current MCC; supplying, installing, and commissioning a new MCC; and providing all associated electrical, mechanical, programming, and testing services. Currently we have a Cutler- Hammer 2100 MCC which is 1600-amps, 480-volt, 3-phase, 4-wir. We currently have four banks which each breaker feeding the pumps is 800-amp. The control system we currently have is a Watch Dog system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Storm Pump Station Telemetry and Supervisory Control and Data (“SCADA”) System.
Posted Date
Nov 14, 2025
Due Date
Jan 9, 2026
Release: Nov 14, 2025
Close: Jan 9, 2026
Storm Pump Station Telemetry and Supervisory Control and Data (“SCADA”) System.
AvailableConstruction and commissioning of a new sanitary sewer pump station located on City property west of Demers Drive including a new wet well, pumps, telemetry, utilities, fencing and landscape restoration. Project also includes removal and decommission of the existing pump station.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Construction and commissioning of a new sanitary sewer pump station located on City property west of Demers Drive including a new wet well, pumps, telemetry, utilities, fencing and landscape restoration. Project also includes removal and decommission of the existing pump station.
AvailableEngineering, design, manufacture, testing, preparation for shipment, and delivery of one (1) new Circulating and Reservoir Water Pump Motor and accessories
Posted Date
Oct 24, 2025
Due Date
Jan 15, 2026
Release: Oct 24, 2025
Close: Jan 15, 2026
Engineering, design, manufacture, testing, preparation for shipment, and delivery of one (1) new Circulating and Reservoir Water Pump Motor and accessories
AvailableThe project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
The project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis