Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
The project involves the following descriptions of work: replace three existing 50 hp pump and motor assemblies with new 60 hp submersible units in the existing mls#4 dry pit, remove and replace associated electrical components, including conduit, wiring, disconnects, and control panels, valves and fittings.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide lock lift pump station repair/replacement. Two (2) new pumps, 40 GPM and 108 feet TDH, 5.0 HP, 3450 RPM, 460/3/60 Hz will be procured and installed within the Lock Wall lift station. The existing pump supports within the lift station are damaged and new pump supports will need to be installed. See attached file.
Posted Date
Dec 15, 2025
Due Date
Dec 29, 2025
Release: Dec 15, 2025
Close: Dec 29, 2025
Provide lock lift pump station repair/replacement. Two (2) new pumps, 40 GPM and 108 feet TDH, 5.0 HP, 3450 RPM, 460/3/60 Hz will be procured and installed within the Lock Wall lift station. The existing pump supports within the lift station are damaged and new pump supports will need to be installed. See attached file.
AvailableThe work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
The work for which proposals are to be received consists of the following: post hurricane ian lift station control panel platforms procurement phase 1
AvailableWork includes: Demolish existing pump vase, pressure relieve valve, and piping; construct new reinforced concrete pump pedestal; install pipe to align with owner-furnished pump and motor for High Lift Pump 5; connect new pump to existing discharge piping system; connect new pump to existing discharge piping system; commission and test the completed installation.
Posted Date
Dec 16, 2025
Due Date
Feb 3, 2026
Release: Dec 16, 2025
Close: Feb 3, 2026
Work includes: Demolish existing pump vase, pressure relieve valve, and piping; construct new reinforced concrete pump pedestal; install pipe to align with owner-furnished pump and motor for High Lift Pump 5; connect new pump to existing discharge piping system; connect new pump to existing discharge piping system; commission and test the completed installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →