CityGA
Posted
Aug 20, 2026
Sep 22, 2026
Noonday Creek Trail Connection
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
Description: The City of Aurora's Inspiration Trail Connection project is a construction effort to create a new accessible link between the Piney Creek Regional Trail and the Inspiration Trail network in south Aurora. The connection is intended to link Inspiration to a broader regional trail network, with the Inspiration Metropolitan District completing its portion and the City of Aurora completing its segment. Arapahoe County awarded $250,000 in open-space grant funding for the project, but the solicitation itself is a construction procurement rather than a grant-program solicitation.
City · CO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityGA
Posted
Aug 20, 2026
Sep 22, 2026
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
CityAZ
Posted
Aug 13, 2026
Sep 15, 2026
The Town of Cave Creek is seeking proposals from qualified trail design-build contractors for the East-West Trail Connection, a new non-motorized trail within the Town's dedicated trail easement. The project includes final trail alignment development and construction of approximately 2,637 linear feet of compacted native-surface trail with a minimum width of four feet. The selected contractor will work with the Town to finalize the alignment and construct a safe, sustainable, durable, low-maintenance trail consistent with the Town's applicable trail standards.
CityGA
Posted
Aug 20, 2026
Sep 22, 2026
Constructing an 8-Ft multi-use trail & stormwater drainage improvements, as well as a traffic calming island. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping.
CityGA
Posted
Aug 20, 2026
Sep 17, 2026
The City of Roswell is soliciting qualifications from engineering and design firms for the Vickery Creek Trail Connection project. The work is intended to alleviate congestion and parking issues, improve park and trail connectivity, and provide safe, universal public access. The open RFQ includes a non-mandatory pre-bidders conference and requires a proposal submission by the September 17, 2026 deadline.
Decision makers connected to this RFP from City of Aurora.