CityGA
Aug 20, 2026
Closes
Sep 22, 2026
Noonday Creek Trail Connection
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
Description: The Town of Cave Creek is seeking proposals from qualified trail design-build contractors for the East-West Trail Connection, a new non-motorized trail within the Town's dedicated trail easement. The project includes final trail alignment development and construction of approximately 2,637 linear feet of compacted native-surface trail with a minimum width of four feet. The selected contractor will work with the Town to finalize the alignment and construct a safe, sustainable, durable, low-maintenance trail consistent with the Town's applicable trail standards.
City · AZ, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityGA
Aug 20, 2026
Closes
Sep 22, 2026
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
CityGA
Aug 20, 2026
Closes
Sep 22, 2026
Constructing an 8-Ft multi-use trail & stormwater drainage improvements, as well as a traffic calming island. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping.
Apex Park And Recreation District
Special DistrictCO
-
Closes
Sep 3, 2026
The current posting is for Phase 1 of a trail connection from the sidewalk on the west side of 72nd Avenue to the Ralston Creek Trail through the Apex Center parking lot in Arvada, Colorado. The matching 26-7201 project record describes demolition, landscaping and irrigation, concrete work, and relocation of light poles and a fire hydrant, identifying this as a formal construction RFP rather than a grant program. The current BidNet Direct detail page was published on 08/20/2026 and lists a closing time of 09/03/2026 04:00 PM MDT; its detailed description and bid documents are restricted to registered users.
CityGA
Aug 20, 2026
Closes
Sep 17, 2026
The City of Roswell is soliciting qualifications from engineering and design firms for the Vickery Creek Trail Connection project. The work is intended to alleviate congestion and parking issues, improve park and trail connectivity, and provide safe, universal public access. The open RFQ includes a non-mandatory pre-bidders conference and requires a proposal submission by the September 17, 2026 deadline.
Decision makers connected to this RFP from Town of Cave Creek.