CityGA
Aug 20, 2026
Closes
Sep 22, 2026
Noonday Creek Trail Connection
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
Description: Constructing an 8-Ft multi-use trail & stormwater drainage improvements, as well as a traffic calming island. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping.
City · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityGA
Aug 20, 2026
Closes
Sep 22, 2026
Construction of a 10 trail. Work includes concrete sidewalk, stormwater drainage and concrete ditch paving.
CountyCO
Aug 10, 2026
Closes
Aug 31, 2026
The solicitation seeks construction of the Macanta Regional Park trail connection pedestrian bridge in Colorado. It is categorized under construction (NAICS 237990) and concerns Macanta Regional Park, a 450-acre park owned by Douglas County. The opportunity opened on August 10, 2026, and closes on August 31, 2026, at 5:00 PM MDT.
CountyCO
Aug 10, 2026
Closes
Aug 31, 2026
: The project requires a prequalified manufacturer to handle the complete engineering design, shop drawing preparation, structural fabrication, and freight delivery of one 80-foot long by 12Ft wide clear-span, underhung truss pedestrian bridge made of weathering structural steel with a concrete deck, coordinates with the installation contractor, and provides all necessary installation instructions, anchor bolts, and structural hardware.
CountyCO
-
Closes
Aug 31, 2026
The open-bid listing is titled “MACANTA REGIONAL PARK TRAIL CONNECTION PEDESTRIAN BRIDGE” and concerns a pedestrian-bridge trail connection at Macanta Regional Park. It shows a publication date of 08/10/2026 and a closing time of 08/31/2026 05:00 PM MDT, which is after the current date 2026-08-12. The accessible listing locks the narrative scope and bid documents, while the official Douglas County record describes the related work as final design, bidding, and construction administration rather than a grant program.
Procurement and program contacts connected to City of Woodstock.