Wisconsin Department of Administration
State AgencyWI
Sep 18, 2026
Closes
Sep 1, 2026
MEP - HVAC System Renovation RFP
In general, the work consists of: a remodel and renovation of the HVAC system to install a new Air handling system with the existing basement mechanical room located in the northeast corner of the building. Currently the existing single AHU in the basement is the single source of ventilation air and cooling for the building, with space reheat coils providing the final air tempering. The building contains laboratories including BSL3 spaces. The new air handling unit will be connected to the existing building HVAC system to provide a N+1 redundant supply fan configuration.