HSIP Cycle 11 & 12: Unsignalized Crossing Improvement Project
Work includes 1 LS demolition and removal; 485 SF pcc curb ramp; 160 LF pcc curb and gutter; 928 SF pcc sidewalk; 194 SF detectable warning surface tile (cast in place); 32 sf detectable warning surface tile (surface applied); 66 ton class 2 aggregate base; 27 ton asphalt concrete (type a); 89 SF 4" to 6" river rock embedded into wet concrete; 2 EA adjust (e) utility box to finished grade; 36 EA relocate (e) sign; 15 EA install (n) rrfb solar assembly; 20 EA install (n) rrfb light bar; 4 EA install (n) type 1b post (4" NPS); 7 EA nstall (n) pedestrian push button post (2.5".NPS). See attached file.