Closing soon

High Side Tank Improvement Project

Description: The work consists of rehabilitation and upgrade of the existing 3,000,000 gallon High Side Tank consisting of but not limited to: interior blasting and epoxy coating with mill scale removal as needed; tank disinfection; replacement of cathodic protection anode bags, upsizing of existing manway, replacement of vent mesh screening, and tank level indicator; installation of a fire hydrant, temporary pressure relief valve, and associated piping; and modification of pressure set-points at the Long Valley Booster Pump Station pressure regulating station.

Released
Sep 28, 2026
Closes
Oct 20, 2026(6 days left)

RFP documents

Solicitation files and supporting documents for this bid.

RFP documents aren’t available here yet.

Our team can help you find the original solicitation documents.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts