Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes lift station improvements includes new valves, piping, and flow meter within dry well, new cathodic protection anodes on dry well chimney, new controls and instrumentation, new control panel and electrical equipment enclosures above grade, new bypass connection and structure, modifications to the wet well, lining wet well and bypass chamber structures, site concrete and landscaping removal/replacements, bypass pumping and/or pump and haul, sesc, restoration, and all appurtenant work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes approx 1,526 LF 6" force main via horizontal directional bore from the existing sanitary pumping station. The existing force main will be abandoned in place. The sanitary pumping station modifications consist of new floor hatch doors, valves and piping. Operations will require phasing to keep the sanitary pumping station operational during the work. See outside link.
AvailableLift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
The City of Edinburg seeks bids for rerouting the force main from Lift Station No. 19 at 115 E. Rogers Road and installing first‑time gravity sanitary sewer service for properties along Rogers Road from I‑69C to M Road. The work includes utility construction within the city’s wastewater system and is funded under HUD Community Project Funding (Grant No. B-24-CP-TX-2090). Addendum #1 extended the bid due date to February 3, 2026 at 3:00 pm CT.
Posted Date
Dec 3, 2025
Due Date
Feb 3, 2026
Release: Dec 3, 2025
Close: Feb 3, 2026
The City of Edinburg seeks bids for rerouting the force main from Lift Station No. 19 at 115 E. Rogers Road and installing first‑time gravity sanitary sewer service for properties along Rogers Road from I‑69C to M Road. The work includes utility construction within the city’s wastewater system and is funded under HUD Community Project Funding (Grant No. B-24-CP-TX-2090). Addendum #1 extended the bid due date to February 3, 2026 at 3:00 pm CT.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Available