Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
AvailableWork includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
AvailableWork includes 1 LS construction activities for lift station n-07; 1 ls construction activities for proposed n-7 meter vault; 1 LS base 20 hp pumps, settables and installation ; 1 LS electrical and instrumentation for 20 hp pumps; 1 LS construction activities for the aerial force main replacement; 1 LS new aluminum railings, fencing and gates including signed and sealed drawings by specialty engineer; 50 LF epoxy sealing of concrete cracks; 40 CF concrete repair; 50 LF new epoxy set rebar installation; 1 LS pre-trenching; 1 LS upgraded 25 hp pumps, settables and installation ; 1 LS upgraded electrical and instrumentation for 25 hp pumps. See outside link.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Work includes 1 LS construction activities for lift station n-07; 1 ls construction activities for proposed n-7 meter vault; 1 LS base 20 hp pumps, settables and installation ; 1 LS electrical and instrumentation for 20 hp pumps; 1 LS construction activities for the aerial force main replacement; 1 LS new aluminum railings, fencing and gates including signed and sealed drawings by specialty engineer; 50 LF epoxy sealing of concrete cracks; 40 CF concrete repair; 50 LF new epoxy set rebar installation; 1 LS pre-trenching; 1 LS upgraded 25 hp pumps, settables and installation ; 1 LS upgraded electrical and instrumentation for 25 hp pumps. See outside link.
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" gate valve; See Outside link
Posted Date
Dec 2, 2025
Due Date
Feb 3, 2026
Release: Dec 2, 2025
Close: Feb 3, 2026
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" gate valve; See Outside link
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis