Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lake Jackson
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Grants
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
Posted Date
Nov 10, 2025
Due Date
Nov 25, 2025
Release: Nov 10, 2025
City of Grants
Close: Nov 25, 2025
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
City of Brighton
Perform owner's advisor services for the lift station and force main progressive.
Posted Date
Oct 22, 2025
Due Date
Dec 6, 2025
Release: Oct 22, 2025
City of Brighton
Close: Dec 6, 2025
Perform owner's advisor services for the lift station and force main progressive.
AvailableCity of Greeley
DESIGN/BUILD: interceptor, lift station, and force main.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
City of Greeley
Close: Dec 11, 2025
DESIGN/BUILD: interceptor, lift station, and force main.
AvailableSummit County
Pump Station No. 82 and Force Main Replacement.
Posted Date
Oct 24, 2025
Due Date
Dec 12, 2025
Release: Oct 24, 2025
Summit County
Close: Dec 12, 2025
Pump Station No. 82 and Force Main Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis