Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes approx. 735 LF 30" Diameter PVC Force Main-Restrained; 559 LF 30" Diameter PVC Force Main-Unrestrained;1 EA 30" Line Stop; 200 YD Foundation Stabilization; 1 EA 30" plug valve; See Outside link
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pump Station No. 82 and Force Main Replacement.
Posted Date
Oct 24, 2025
Due Date
Dec 12, 2025
Release: Oct 24, 2025
Close: Dec 12, 2025
Pump Station No. 82 and Force Main Replacement.
Premium
Access the largest public sector contact database
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
AvailableConstruction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
Posted Date
Sep 12, 2025
Due Date
Dec 17, 2025
Release: Sep 12, 2025
Close: Dec 17, 2025
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
AvailableWork will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Work will include pump station piping and pump removal and replacement/upgrades; installation of an emergency backup generator; necessary electrical upgrades; manifold of existing force mains; coating of the existing wet well; and all other associated activities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis