2026 Spring Valley Water Main Replacement Project RFP
Aug 5, 2026
Closes
Sep 3, 2026
Work inlcudes approx 120 LF 2" SDR 21 Water Main; 5,100 LF 6" C900 Water Main DR18; 1,480 LF 8" C900 Water Main DR18; 20 EA 6" Internal Restraint; 4 EA 2" x3/"' Water Lateral and Meter Re-Set; 2 EA 3/4" Service Line and Connection at House (Galvanized); 1 EA 6"x6" Tapping Sleeve and Valve; 2 EA 6" Cut and Cap; 8 EA Fire Hydrant Removal; 4,800 LB Mechanical Joint Fittings (Including Megalugs).