CityMA
Jul 22, 2026
Closes
Aug 12, 2026
JHPL Elevator Modernization RFP
Elevator modernization.
Description: The Habitat 1 Elevator Modernization project will include the addition of a 1-ton ductless split system to the existing mechanical room, the addition of a new sump pump to the existing elevator sump pit, and the modernization of the existing elevator.
StateAgency · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Jul 22, 2026
Closes
Aug 12, 2026
Elevator modernization.
CityWA
Jul 24, 2026
Closes
Aug 18, 2026
Work consists of modernization of two machine room less traction elevators including, but not limited to, new systems and components and other work.
State AgencyAL
Aug 4, 2026
Closes
Aug 27, 2026
Work will include the installation of a new ductless split system in the elevator control room, the installation of a new sump pump in a new elevator sump pit, and the installation of a new elevator and shaft within the building. The elevator shaft will be 8" reinforced concrete masonry unit walls. The shaft will be located adjacent to an existing load bearing CMU wall. Shoring of the wall will be required for installation of the elevator pit.
OtherTX
Jul 22, 2026
Closes
Sep 2, 2026
Complete a full modernization of both passenger elevators, including replacement of mechanical and electrical equipment, controllers, drives, machines, motors, door equipment, fixtures, hoistway equipment, safety devices, and related systems.