Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
US Space and Rocket Center
Work includes improvements to multiple sets of restrooms including removal and disposal of interior architecture and finishes, plumbing systems, and electrical & lighting systems and installing new wall, floor, and ceiling finishes, along with updated plumbing fixtures, toilet partitions, and accessories.
Posted Date
Mar 4, 2026
Due Date
Apr 2, 2026
Release: Mar 4, 2026
US Space and Rocket Center
Close: Apr 2, 2026
Work includes improvements to multiple sets of restrooms including removal and disposal of interior architecture and finishes, plumbing systems, and electrical & lighting systems and installing new wall, floor, and ceiling finishes, along with updated plumbing fixtures, toilet partitions, and accessories.
AvailableUS Space and Rocket Center
Work includes include (3) structural foundations and (3) steel columns for the plane to mount at the requested position. There is limited concrete and landscape demolition. It will have limited concrete flatwork, landscape rock, lighting, a flagpole & lightning protection.
Posted Date
Mar 3, 2026
Due Date
Mar 26, 2026
Release: Mar 3, 2026
US Space and Rocket Center
Close: Mar 26, 2026
Work includes include (3) structural foundations and (3) steel columns for the plane to mount at the requested position. There is limited concrete and landscape demolition. It will have limited concrete flatwork, landscape rock, lighting, a flagpole & lightning protection.
AvailableUS Space and Rocket Center
Work includes replacement of concrete steps, metal railing and aluminum storefront. Work includes demolition to the concrete steps inside the existing to remain concrete cheek walls. The aluminum storefront system including a single door and fixed glass will be removed and replaced with a double door with fixed glass.
Posted Date
Feb 21, 2026
Due Date
Mar 17, 2026
Release: Feb 21, 2026
US Space and Rocket Center
Close: Mar 17, 2026
Work includes replacement of concrete steps, metal railing and aluminum storefront. Work includes demolition to the concrete steps inside the existing to remain concrete cheek walls. The aluminum storefront system including a single door and fixed glass will be removed and replaced with a double door with fixed glass.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track US Space and Rocket Center's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database