CityTN
Posted
Aug 30, 2026
Sep 15, 2026
Grounds Maintenance for Pump Stations and CSOTF for the City of Chattanooga RFP
Provide grounds maintenance services for pump stations & CSOTF for the city wastewater department.
Description: The City of Chattanooga posted Invitation for Bid 200989, titled Grounds Maintenance for Pump Stations and CSOTF for the City of Chattanooga, for grounds maintenance at pump stations and CSOTF facilities. The official solicitation abstract lists the opportunity as Active, with a posted date of 8/30/26 8:00 AM and a bid deadline of 9/15/26 2:00 PM in US Eastern Time. The detail page contains no grant-program language, names no additional buyer, and provides no primary PDF, DOC/DOCX, or PPT attachment.
City · TN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTN
Posted
Aug 30, 2026
Sep 15, 2026
Provide grounds maintenance services for pump stations & CSOTF for the city wastewater department.
CityIL
Posted
Aug 19, 2026
Sep 18, 2026
The City of Rockford is soliciting bids under BID NO. 726-PW-071 for grounds maintenance at water sites and fire stations. The opportunity is listed under the Public Works Department and is currently open. The official posting gives a publication date of August 19, 2026, and a bid-closing deadline of September 18, 2026, at 11:00 AM.
Indian Trail Improvement District
Special DistrictFL
Posted
Aug 3, 2026
Oct 5, 2026
Work includes infrastructure repair work at pump station 2 (ps-2) and pump station 3 (ps-3), both located within the m-1 drainage basin, replacement of the existing steel expanded metal grating decking with corrosion-resistant material in removable sections, repair and marine-grade epoxy coating of the structural beam deck subframe, replacement of four (4) 6-inch schedule 80 pipe deck columns (approximately 50% submerged), and fabrication and installation of a new heat exchanger beam support system including shop fabrication, sandblasting, epoxy coating, removal of the existing system, and installation of the new system.
CityLA
Posted
Aug 14, 2026
Oct 6, 2026
Provide wastewater pump stations electrical rehabilitation.
Decision makers connected to this RFP from City of Chattanooga.