CityCA
Posted
Aug 27, 2026
Sep 23, 2026
Zone 3 and 4 Pump Station Upgrades and Hillsborough Pump Station Electrical Upgrades
Project consists of pump station upgrades and pump station electrical upgrades.
Description: Work includes infrastructure repair work at pump station 2 (ps-2) and pump station 3 (ps-3), both located within the m-1 drainage basin, replacement of the existing steel expanded metal grating decking with corrosion-resistant material in removable sections, repair and marine-grade epoxy coating of the structural beam deck subframe, replacement of four (4) 6-inch schedule 80 pipe deck columns (approximately 50% submerged), and fabrication and installation of a new heat exchanger beam support system including shop fabrication, sandblasting, epoxy coating, removal of the existing system, and installation of the new system.
SpecialDistrict · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCA
Posted
Aug 27, 2026
Sep 23, 2026
Project consists of pump station upgrades and pump station electrical upgrades.
CityFL
Posted
Aug 6, 2026
Sep 30, 2026
Storm Pump Station Repair and Maintenance Services.
CityTX
Posted
-
Sep 29, 2026
Construction of 94 ft diameter concrete upflow clarifier no. 3, and improvements to three (3) pump stations, modifications to site ground storage tanks, piping, electrical, SCADA, sitework, etc; and all other appurtenances necessary for the complete project
CityNH
Posted
Sep 8, 2026
Sep 30, 2026
Seeking proposals from qualified vendors capable of providing roof repair and replacement services.
Decision makers connected to this RFP from Indian Trail Improvement District.