Water Treatment Plant Treatment Improvements
Provide water treatment plant treatment improvements.
Description: The City of Seguin is soliciting bids for construction of a 94 ft diameter concrete upflow Clarifier No. 3 and improvements to three pump stations, including modifications to ground storage tanks, piping, electrical, SCADA, sitework, and related appurtenances. BidNet Direct identifies the opportunity as AF-2026-64, published 08/19/2026, with bids closing 09/29/2026 at 03:00 PM CDT. The posting is an active construction bid rather than a grant program; no grant or funding program is stated, and the BidNet page does not expose a primary bid file without registration.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityAL
Aug 13, 2026
Closes
Aug 31, 2026
Provide water treatment plant treatment improvements.
CityMT
Jul 28, 2026
Closes
Sep 3, 2026
Project consists of improvements to the existing water treatment plant including installing the previously procured water treatment equipment, replacement of the VFDs and electrical upgrades at the two water supply wells, replacement of the high service pumps within the water treatment plant, and replacement membranes for the existing RO units.
CityNY
Aug 13, 2026
Closes
Sep 8, 2026
Wastewater treatment plant 2026 improvements project
Orange Water And Sewer Authority
Special DistrictNC
Aug 17, 2026
Closes
Sep 25, 2026
Secondary Clarifier #3 is an 85-foot diameter H40A HT Tow-Bro sludge collector clarifier, originally constructed in 1983. The interior clarifier mechanical equipment— including the center-drive mechanism, trusses, header assembly, manifold, influent well, surface skimmers, and scum beach—was replaced approx. five years ago as part of a capital improvement project. The scope of work includes: 1. Temporarily supporting the existing drive mechanism before disconnecting the center cage 2. Rebalancing the drive and replacing the grout between the top of the center pier and the bottom of the drive. 3. Heating up and bending the truss mounting bar back into its original position 4. Replacing manifold seals per manufacturer specifications 5. Mounting a new fluidizing vane to the bottom of the existing header by drilling new holes adjacent to the current ones 6. Installing additional counterweights per the manufacturer’s recommendations 7. Ensuring the drive is fully leveled and up to spec before connecting back to the main cage 8. Coordinating with equipment supplier vendor for certification that repairs were done correctly, and witness testing and performance testing for startup purposes.