Walnut Branch Phase IV Sanitary Sewer & Water Main Replacement RFP
Aug 12, 2026
Closes
Sep 22, 2026
Work consists of rehabilitation of an existing 24" sanitary sewer main, approx 1207 LF, along walnut branch creek (pipe bursting and cured-in-place pipe (CIPP)) as well as a proposed new 30" sanitary sewer pipe, approx 1003 LF, constructed via open-cut construction and jacking and boring. The new main is being constructed to provide a looped system between an existing 12" main along court street and 2" line along mountain street. The new main will be installed within existing right of way. The water line length is approx 89 LF and planned to be installed by open cut method and tied into the existing 8" water main along goodrich street.