CityOR
Posted
Nov 20, 2026
Dec 10, 2026
Galveston Ave PRV and Ped Crossing RFP
The work includes installation of a new 6-inch pressure reducing valve within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. This project also includes construction of a new raised pedestrian crossing to enhance pedestrian safety and accessibility in the project area. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work. The Engineer’s estimate is $445,238.
