Closed

Furnace Creek Tank Metals Rehabilitation

Description: Furnace creek tank metals rehabilitation for the authority's furnace creek tank. The work includes installing a riser on the tank inlet with 4" drilled holes to disburse water as a static mixer, replacing the tank ladder, installing a new 30" manway, replacing the roof vent, installing safety cables on the ladder, and reconfiguring the overflow discharge with a proper air gap including a duckbill check valve, reducer (acting as a funnel following the air gap), and a flapper valve above the concrete splashpad.

Buyer
Released
Jul 1, 2026
Closes
Aug 19, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts