CityLA
Aug 12, 2026
Closes
Sep 8, 2026
Elevated Water Storage Tank Rehabilitation RFP
Elevated water storage tank rehabilitation.
Description: This project involves the rehabilitation of existing elevated water storage tanks to restore structural integrity and operational efficiency. The work is part of the City of Charlotte's water management and sanitation infrastructure maintenance. It is currently listed as an upcoming solicitation with an anticipated posting in early 2027.
City · NC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityLA
Aug 12, 2026
Closes
Sep 8, 2026
Elevated water storage tank rehabilitation.
CityNM
Jul 24, 2026
Closes
Aug 27, 2026
Work includes 60 MH repair welding (if required); 4 GAL pit filling and surfacing (if required); 100 MH interior chipping and/or grinding (if required); 28 EA roof and roof knuckle stiffener replacement (if required); 1 LS obstruction light replacement (if required); 3 EA expansion joints (if selected); 1 LS erosion and sediment control (esc).
CityTX
Aug 6, 2026
Closes
Aug 27, 2026
Work consists of elevated storage tank rehabilitation, includes repair and coating of 1.0 mg tank.
CityTX
Aug 16, 2026
Closes
Sep 17, 2026
Rehabilitation of the 1. 0 mg keller smithfield elevated storage tank.
Procurement and program contacts connected to City of Charlotte.