Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Sacramento is soliciting sealed bids for the Freeport Bridge Deck Repair Project to furnish all labor, materials, and equipment for bridge maintenance in conformance with project specifications. The contract requires completion within thirty working days and adherence to Sacramento County and Caltrans standards. Bids are due by February 26, 2026, for this active construction procurement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for repair and replacement of bridge deck expansion joints and concrete/asphalt deck repairs.
Posted Date
Jan 28, 2026
Due Date
Feb 25, 2026
Release: Jan 28, 2026
Close: Feb 25, 2026
Procurement for repair and replacement of bridge deck expansion joints and concrete/asphalt deck repairs.
AvailableBridge deck overlay.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Bridge deck overlay.
AvailableBridge deck repairs.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Bridge deck repairs.
AvailableThe work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Posted Date
Jan 9, 2026
Due Date
Mar 26, 2026
Release: Jan 9, 2026
Close: Mar 26, 2026
The work on the bridge structure includes the removal and replacement of the cross beams, deck, steel curbs, sidewalk, bridge railing and deck joints along the Tower Spans of the Burlington-Bristol Bridge. Bridge railing removal requires the relocation of existing conduits attached to the bridge railing. Conduit relocation is required to be completed prior to demolition of the bridge deck and other bridge elements with new cabling tested and approved. A structural health monitoring system is installed on the bridge which will remain operational throughout the project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis