CityWI
Jul 14, 2026
Closes
Aug 4, 2026
2026 Riverfront Parking Lot Project
1,000 cy - excavation common; 1,300 lf - concrete curb and gutter; 1,000 cy - base aggregate dense; 800 ton - HMA pavement. Description: 24 sq yd of removing concrete sidewalk; 2 ea of removing manholes; 165 ln ft of removing manholes; 1120 cu yd of excavation common; 500 cu yd of excavation below subgrade; 50 cu yd of granular backfill; 1045 cu yd of base aggregate dense 1 1/4"; 450 cu yd of breaker run with fines; 175 gal of tack coat; 480 ton of HMA pavement 4 MT 58-28 s; 340 ton of HMA pavement 5 MT 58-28 s; 1325 ln ft of concrete curb & gutter 18" type d; 170 ln ft of concrete curb & gutter 30" type d; 70 ln ft of concrete curb pedestrian; 2450 sq ft of concrete sidewalk 4"; 1550 sq ft of concrete sidewalk 6"; 60 sq ft of curb ramp detectable warning field natural patin; 400 ln ft of storm sewer pipe class iii-a 12-inch. See attached file.