Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the complete replacement of all three influent/RAW pumps and six (6) 12” gate-valves.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rehabilitation of the existing Wastewater Treatment Facilities including but not limited to headworks improvements (replacement of mechanical bar screen, wash press, and manual bar screen and installation of new slide gates), removal and replacement of HDPE liner for Aeration Basins 1 and 2, installation of floating aerators in Aeration Basin 2 and transfer of existing floating aerators from Aeration Basin 1 to Aeration Basin 2, replacement of 1 of 2 existing RAS pumps, removal of the clarifier scum pump station and installation of new scum drain lines, removal and replacement of aeration basin underdrain pumps, removal and replacement of various sluice gates throughout WWTP, all required electrical work, and SCADA system improvements.
Posted Date
Dec 23, 2025
Due Date
Feb 12, 2026
Release: Dec 23, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 12, 2026
Rehabilitation of the existing Wastewater Treatment Facilities including but not limited to headworks improvements (replacement of mechanical bar screen, wash press, and manual bar screen and installation of new slide gates), removal and replacement of HDPE liner for Aeration Basins 1 and 2, installation of floating aerators in Aeration Basin 2 and transfer of existing floating aerators from Aeration Basin 1 to Aeration Basin 2, replacement of 1 of 2 existing RAS pumps, removal of the clarifier scum pump station and installation of new scum drain lines, removal and replacement of aeration basin underdrain pumps, removal and replacement of various sluice gates throughout WWTP, all required electrical work, and SCADA system improvements.
AvailableWWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Feb 19, 2026
Release: Nov 6, 2025
Close: Feb 19, 2026
WWTP comprehensive rehabilitation construction project.
AvailableProject consists of the WWTP and lift station improvement project. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Project consists of the WWTP and lift station improvement project. See outside link.
AvailableInland Empire Utilities Agency (IEUA) is soliciting proposals for engineering consulting services for the RP-1 Headworks Influent Channel Rehabilitation Project. Services include design, bid period support, and construction administration. Proposals must be submitted through the agency's PlanetBids portal. The estimated value range is $500,000 to $2,000,000, and the response deadline is January 27, 2026.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Inland Empire Utilities Agency (IEUA) is soliciting proposals for engineering consulting services for the RP-1 Headworks Influent Channel Rehabilitation Project. Services include design, bid period support, and construction administration. Proposals must be submitted through the agency's PlanetBids portal. The estimated value range is $500,000 to $2,000,000, and the response deadline is January 27, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →