Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the WWTP and lift station improvement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableWork includes demolishing existing lift station components proposed for replacement; relining existing wet well; resealing existing wet well pipe penetration; installing new submersible pumps, guide rails, piping, valves, and fittings; reconnecting to existing force main; installing controls and electrical improvements; and completing site work and grading improvements.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Work includes demolishing existing lift station components proposed for replacement; relining existing wet well; resealing existing wet well pipe penetration; installing new submersible pumps, guide rails, piping, valves, and fittings; reconnecting to existing force main; installing controls and electrical improvements; and completing site work and grading improvements.
AvailableProcurement of a General Contractor, Mechanical Contractor, and Electrical Contractor for the Chinatown Station ADA Improvement Project, encompassing accessible elevators, a new headhouse, structural repairs, waterproofing, civil work, mechanical system installations, and a new accessible fire alarm system.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
Procurement of a General Contractor, Mechanical Contractor, and Electrical Contractor for the Chinatown Station ADA Improvement Project, encompassing accessible elevators, a new headhouse, structural repairs, waterproofing, civil work, mechanical system installations, and a new accessible fire alarm system.