Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sarasota
WWTP comprehensive rehabilitation construction project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
International Boundary And Water Commission: U.S.-Mexico
WWTP Rehabilitation & Expansion. Only bids for the following scopes of work are currently being solicited: Pipe Materials, Process Equipment - Slide Gates, Site Work, Shoring, Dewatering, Pre-Engineered Metal Building, Fencing, Bypass, Concrete Demolition, Survey, QC Testing.
Posted Date
Nov 4, 2025
Due Date
Dec 5, 2025
Release: Nov 4, 2025
International Boundary And Water Commission: U.S.-Mexico
Close: Dec 5, 2025
WWTP Rehabilitation & Expansion. Only bids for the following scopes of work are currently being solicited: Pipe Materials, Process Equipment - Slide Gates, Site Work, Shoring, Dewatering, Pre-Engineered Metal Building, Fencing, Bypass, Concrete Demolition, Survey, QC Testing.
AvailableTexas Health and Human Services Commission
Contract inpatient, outpatient hospital services and acute inpatient comprehensive medical rehabilitation services provided to individuals with traumatic spinal cord injury (TBI) and/or traumatic spinal cord injury (SCI). The purpose of the Comprehensive and Rehabilitation Services inpatient and outpatient hospital settings to individuals with TBI and/or TSCI improve self-care, communication, and mobility in order to function more independently in the home and community. Please check the HHS Enrollment Opportunity website regularly for further information and updates.
Posted Date
Nov 14, 2023
Due Date
Aug 31, 2026
Release: Nov 14, 2023
Texas Health and Human Services Commission
Close: Aug 31, 2026
Contract inpatient, outpatient hospital services and acute inpatient comprehensive medical rehabilitation services provided to individuals with traumatic spinal cord injury (TBI) and/or traumatic spinal cord injury (SCI). The purpose of the Comprehensive and Rehabilitation Services inpatient and outpatient hospital settings to individuals with TBI and/or TSCI improve self-care, communication, and mobility in order to function more independently in the home and community. Please check the HHS Enrollment Opportunity website regularly for further information and updates.
AvailableJefferson County
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Jefferson County
Close: Dec 17, 2025
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
AvailableFulton County
The work shall generally include a new 20,000 gallons per day package wastewater treatment plant containing seven precast concrete tanks, one fiberglass filtration building, one UV/post aeration structure, a refrigerated sampler, blowers, pumps, associated electrical, site fencing, site regrading, and landscaping. The installation of a package 150 gpm lift station and 95 FT of 4" force main. The installation of 195 FT of 6" gravity sewer pipe and the installation of a new headwall structure. The existing WWTP will be demolished including all piping, manholes, tanks, building, and other structures.
Posted Date
Oct 10, 2025
Due Date
Dec 10, 2025
Release: Oct 10, 2025
Fulton County
Close: Dec 10, 2025
The work shall generally include a new 20,000 gallons per day package wastewater treatment plant containing seven precast concrete tanks, one fiberglass filtration building, one UV/post aeration structure, a refrigerated sampler, blowers, pumps, associated electrical, site fencing, site regrading, and landscaping. The installation of a package 150 gpm lift station and 95 FT of 4" force main. The installation of 195 FT of 6" gravity sewer pipe and the installation of a new headwall structure. The existing WWTP will be demolished including all piping, manholes, tanks, building, and other structures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis