Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation activities for well nos. 5, 8 & 10: remove vertical turbine pumping equipment remove down-hole equipment rehabilitate wells video inspection of wells rehabilitate/replace equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Snow Hill, NC is soliciting bids for Phase I of its Well No. 4 Water System Rehabilitation project. Work includes complete replacement of the well casing and screens with new 304 stainless steel, cleaning via acid clean and air burst technologies, and testing with a submersible turbine pump as well as full water quality analyses. The project duration is expected to be approximately 210 days and includes MBE/WBE participation goals as specified.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Snow Hill, NC is soliciting bids for Phase I of its Well No. 4 Water System Rehabilitation project. Work includes complete replacement of the well casing and screens with new 304 stainless steel, cleaning via acid clean and air burst technologies, and testing with a submersible turbine pump as well as full water quality analyses. The project duration is expected to be approximately 210 days and includes MBE/WBE participation goals as specified.
WWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Jan 22, 2026
Release: Nov 6, 2025
Close: Jan 22, 2026
WWTP comprehensive rehabilitation construction project.
AvailableWell #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Well #6 Well House Rehabilitation. The Project generally includes: the rehabilitation of the well, the installation of an emergency power source (backup generator), building upgrades, electrical upgrades, general site work, the installation of a concrete loading dock, the supply and installation of new valves, piping, and chemical feed equipment, as well as associated equipment and appurtenances.
AvailableConstruction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 22, 2026
Release: Dec 30, 2025
Close: Jan 22, 2026
Construction of well rehabilitation. The work for which proposals are invited consists of pulling and inspecting the pump, pump motor, and bowl assembly, televising the well, assessing the condition of the well equipment, and a report detailing recommended improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →