Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of the existing Wastewater Treatment Facilities including but not limited to headworks improvements (replacement of mechanical bar screen, wash press, and manual bar screen and installation of new slide gates), removal and replacement of HDPE liner for Aeration Basins 1 and 2, installation of floating aerators in Aeration Basin 2 and transfer of existing floating aerators from Aeration Basin 1 to Aeration Basin 2, replacement of 1 of 2 existing RAS pumps, removal of the clarifier scum pump station and installation of new scum drain lines, removal and replacement of aeration basin underdrain pumps, removal and replacement of various sluice gates throughout WWTP, all required electrical work, and SCADA system improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Rutherfordton is soliciting sealed bids for the Rutherfordton WWTP USDA Rehabilitation Project, which includes headworks upgrades, aeration basin liner replacement, pump replacements, sluice gate replacements, electrical, and SCADA improvements. Bid documents are distributed via WithersRavenel/QuestCDN (Quest project #9998746) with a pre‑bid conference on January 6, 2026. Bids are due January 29, 2026 at 2:00 PM local time and will be publicly opened; the project is funded in part by USDA Rural Development and NCDWI programs and is subject to BABAA requirements.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The Town of Rutherfordton is soliciting sealed bids for the Rutherfordton WWTP USDA Rehabilitation Project, which includes headworks upgrades, aeration basin liner replacement, pump replacements, sluice gate replacements, electrical, and SCADA improvements. Bid documents are distributed via WithersRavenel/QuestCDN (Quest project #9998746) with a pre‑bid conference on January 6, 2026. Bids are due January 29, 2026 at 2:00 PM local time and will be publicly opened; the project is funded in part by USDA Rural Development and NCDWI programs and is subject to BABAA requirements.
AvailableWWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Jan 22, 2026
Release: Nov 6, 2025
Close: Jan 22, 2026
WWTP comprehensive rehabilitation construction project.
AvailableRelease: Dec 8, 2025
Close: Jan 9, 2026
Stormwater rehabilitation project.
DESIGN-BUILD. Manitou hydroelectric turbine & generator rehabilitation project.
Posted Date
Dec 11, 2025
Due Date
Jan 23, 2026
Release: Dec 11, 2025
Close: Jan 23, 2026
DESIGN-BUILD. Manitou hydroelectric turbine & generator rehabilitation project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis