Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Inland Empire Utilities Agency
The Inland Empire Utilities Agency (IEUA) has issued a Request for Proposals (Project EN23038) seeking qualified engineering consultants to provide professional engineering consulting services for the HVAC System Upgrade of the Operations Building at the Carbon Canyon Water Reclamation Facility (CCWRF) in Chino, California. The scope covers the design and bid-phase assistance for replacing chilled water air handlers, boilers, zoning, and controls at the Operations Building for improved climate management. This engineering services RFP is a precursor to the construction phase of the CCWRF HVAC System Upgrade project.
Posted Date
Jul 15, 2026
Due Date
Aug 19, 2026
Release: Jul 15, 2026
Inland Empire Utilities Agency
Close: Aug 19, 2026
The Inland Empire Utilities Agency (IEUA) has issued a Request for Proposals (Project EN23038) seeking qualified engineering consultants to provide professional engineering consulting services for the HVAC System Upgrade of the Operations Building at the Carbon Canyon Water Reclamation Facility (CCWRF) in Chino, California. The scope covers the design and bid-phase assistance for replacing chilled water air handlers, boilers, zoning, and controls at the Operations Building for improved climate management. This engineering services RFP is a precursor to the construction phase of the CCWRF HVAC System Upgrade project.
AvailableInland Empire Utilities Agency
The Inland Empire Utilities Agency (IEUA) is seeking engineering consulting services for the Carbon Canyon Water Recycling Facility (CCWRF) RAS Header Replacement project, designated as Project EN23035. The scope of work includes replacing three 16-inch connections to the RAS header and approximately 22 feet of 36-inch pipe, with a potential bypass addition. Proposals must be submitted electronically through IEUA's PlanetBids vendor portal under solicitation RFP-JV-26-007.
Posted Date
Jul 14, 2026
Due Date
Aug 19, 2026
Release: Jul 14, 2026
Inland Empire Utilities Agency
Close: Aug 19, 2026
The Inland Empire Utilities Agency (IEUA) is seeking engineering consulting services for the Carbon Canyon Water Recycling Facility (CCWRF) RAS Header Replacement project, designated as Project EN23035. The scope of work includes replacing three 16-inch connections to the RAS header and approximately 22 feet of 36-inch pipe, with a potential bypass addition. Proposals must be submitted electronically through IEUA's PlanetBids vendor portal under solicitation RFP-JV-26-007.
AvailableInland Empire Utilities Agency
The Inland Empire Utilities Agency (IEUA) has issued Request for Proposal RFP-JV-26-009 (Project No. EN23074) seeking engineering consulting services for the Carbon Canyon Water Reclamation Facility (CCWRF) Influent Box Rehabilitation at the Primary Clarifiers. The scope of work involves removing degraded coating, restoring concrete thickness, and applying a new protective coating to rehabilitate the influent box. Proposals are being solicited electronically through PlanetBids and are due by August 25, 2026 at 2:00 PM PDT.
Posted Date
Jul 14, 2026
Due Date
Aug 25, 2026
Release: Jul 14, 2026
Inland Empire Utilities Agency
Close: Aug 25, 2026
The Inland Empire Utilities Agency (IEUA) has issued Request for Proposal RFP-JV-26-009 (Project No. EN23074) seeking engineering consulting services for the Carbon Canyon Water Reclamation Facility (CCWRF) Influent Box Rehabilitation at the Primary Clarifiers. The scope of work involves removing degraded coating, restoring concrete thickness, and applying a new protective coating to rehabilitate the influent box. Proposals are being solicited electronically through PlanetBids and are due by August 25, 2026 at 2:00 PM PDT.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Inland Empire Utilities Agency
The committee meeting covered a review of the third quarter budget amendment and the adoption of a resolution for the amended budget for the 2025/26 fiscal year. Financial administrative tasks included the approval of a report on general disbursements. Additionally, an investment performance review was conducted, and various financial matters, including brine line rate structure evaluations, were discussed.
The agenda includes workshop items covering an update on the Enterprise Resource Planning Program and a human resources update. Other key topics involve the General Manager's comments, future agenda item requests, and director comments. A closed session is scheduled to address threats to public services, existing and anticipated litigation, and public employee performance evaluations. Additionally, the meeting will feature a presentation regarding recognition by the California Water Environment Association.
The committee meeting addressed several operational and infrastructure projects. Key discussion items included the approval of a construction contract change order for the CCWRF Asset Management and Improvements Project, contract amendments for sodium hypochlorite and polymer chemicals, and an amendment for engineering services during the RP-5 expansion project. Additionally, the committee considered awarding construction management service contracts for the Montclair Force Main and RP-1 primary clarifiers, as well as master service contracts for air emissions testing. The agenda also included status updates on the RP-1 solids thickening project and the RP-5 expansion project.
The agenda for the Audit Committee meeting includes the approval of the Fiscal Year 2026/27 Annual Audit Plan and direction for its implementation. Information items scheduled for discussion cover the audit function, planning and engagement communications for the 2025/26 financial audit, an update on the regional sewage service contract and Ordinance No. 114 compliance review, and the internal audit quarterly status report.
This document is an update to the Inland Empire Utilities Agency's Hazard Mitigation Plan, aimed at reducing and eliminating loss of life and property from natural and man-made hazards. It focuses on assessing risks from earthquakes, climate change-induced drought, flooding, windstorms, and cyber security, and developing strategies to build a more disaster-resilient community. The plan seeks to protect critical infrastructure, ensure continuous water services, and enhance public understanding of potential impacts and mitigation measures.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Inland Empire Utilities Agency's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge