Elevated Airport Tank Rehabilitation
Work includes 60 MH repair welding (if required); 4 GAL pit filling and surfacing (if required); 100 MH interior chipping and/or grinding (if required); 28 EA roof and roof knuckle stiffener replacement (if required); 1 LS obstruction light replacement (if required); 3 EA expansion joints (if selected); 1 LS erosion and sediment control (esc).