PCAC Health Information (36C776)
FederalOH
Posted
Sep 10, 2026
Sep 22, 2026
EHRM Infrastructure Upgrades Construction RFP
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials to perform work as required by the drawings and specifications. B. Facility Fiber Infrastructure – Upgrade fiber optic cables per the OIT standard. Project scope includes fiber distribution within building corridors and necessary connections for new fiber. C. Telecommunication Rooms (TR) – Upgrade new TRs in multiple buildings throughout the campus in compliance with the OIT standard. This includes architectural, electrical, and mechanical work in addition to TR equipment room fittings and cabling.