EAST BLUFF WATER INFRASTRUCTURE UPGRADES RFP
Posted
Sep 10, 2026
Oct 1, 2026
This RFP is for general contractors to replace approximately 4,700 LF of 4", 6" & 8" welded HDPE water main, including replacing water service connections, valves, adding fire hydrants, blow-off assemblies, and an air-vac assembly, connecting to the existing system, decommissioning AC water mains, and restoring surfaces.
