CityWA
Posted
-
Sep 16, 2026
Description: The project consists of upgrades to the Village of Huntley's East and West Wastewater Treatment Plants. The East work includes electrical distribution improvements, mechanical and plumbing upgrades to Control Building 1, Demolition to Final Clarifier 1, Aerobic Digester Piping improvements, Oxidation Ditch mechanical equipment replacement and removal and replacement of the air compressor. The West WWTP includes UV system upgrades, Removal and Replacement of Sludge Pump, Non-potable water upgrades, removal and replacement of dissolved oxygen probes for Oxidation Ditch No 3, Diffuser Grid Equipment upgrades for the Aerobic Digesters, complete with tank cleaning and the removal and replacement of the air compressor as shown in the plans.
City · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Village of Huntley.
Adjacent opportunities open for bidding right now.
CityWA
Posted
-
Sep 16, 2026
Installation of a new micro strainer, new return weir modifications, and appurtenances to facilitate the treatment plant improvements includes 1 LS clearing and grubbing, 1 LS trench excavation safety system, 1 LS construction stormwater management, 1 LS micro strainer with weatherproofing package, 1 LS adjustable weir modifications, 2 EA watermain valve replacement.
CityNY
Posted
Jul 31, 2026
Sep 18, 2026
Upgrades to the WWTP, including upgrades to the existing headworks system, new sequencing batch reactor, new sludge holding tanks, new flow equalization tanks and associated pump station, conversion of existing effluent pump station to re-aeration tank, renovations to an existing operation/control building, new UV disinfection system, new sludge processing equipment, miscellaneous architectural upgrades, yard piping, site work and appurtenances.
CityNC
Posted
Aug 27, 2026
Sep 28, 2026
Work includes rehabilitation and replacement of multiple items at the wastewater treatment plant (wwtp), replacement of the grit removal system, one (1) influent pump, one (1) vfd, and modifications to the associated electrical.
CityCA
Posted
Sep 8, 2026
Sep 18, 2026
The City of San Mateo's Public Works Department is seeking a qualified consultant to provide network monitoring and management services for the Wastewater Treatment Plant and its collection system. The work includes ongoing monitoring and technical oversight of the Plant Control System and supporting infrastructure, continuous remote monitoring of network devices, incident response, preventive maintenance, and monthly reporting. The solicitation is open and accepts proposals until September 18, 2026 at 2:00 PM.