Drilled Pier Foundations - Washington/Farrington Road T-Line
Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
Description: Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
City · OH, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityOH
Posted
Sep 6, 2026
Oct 19, 2026
Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
CityOH
Posted
Sep 6, 2026
Oct 19, 2026
Perform transmission line construction work for the 69kv tranmission line project.
CityOH
Posted
Sep 6, 2026
Oct 12, 2026
Provide substation steel structures for the piqua 69kv the site substation project.
Lauderdale County Water System
Special DistrictTN
Posted
Apr 15, 2026
Sep 16, 2026
Work includes approx 1 LS erosion control; 5,364 LF of 6" PVC SDR 21 water line with tracer wire; 1,744 LF of 8" HDPE DR11 by directional bore with tracer wire; 170 LF of 12" C900 casing pipe.