CityOH
Posted
Sep 6, 2026
Oct 19, 2026
Drilled Pier Foundations - Washington/Farrington Road T-Line RFP
Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
Description: Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
City · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Sep 6, 2026
Oct 19, 2026
Work consists of constructing the cast-in-place drilled pier foundations for the transmission line structures.
CityOH
Posted
Sep 6, 2026
Oct 19, 2026
Perform transmission line construction work for the 69kv tranmission line project.
CityOH
Posted
Sep 6, 2026
Oct 12, 2026
Provide substation steel structures for the piqua 69kv the site substation project.
CountyVA
Posted
Aug 24, 2026
Oct 7, 2026
Work consists of consists of providing approx. 1,035 linear feet of 16-inch ductile iron, polyethylene wrapped and 700 linear feet of 4-, 6-, 8- and 12-inch ductile iron, polyethylene wrapped water main; the installation of approx. five (5) water services and four (4) fire hydrants; and providing site and pavement restoration.
Decision makers connected to this RFP from City of Piqua.