Wilson Thompson Road Water Line Replacement
Posted
Apr 15, 2026
Sep 16, 2026
Work includes approx 1 LS erosion control; 5,364 LF of 6" PVC SDR 21 water line with tracer wire; 1,744 LF of 8" HDPE DR11 by directional bore with tracer wire; 170 LF of 12" C900 casing pipe.