Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for dam rehabilitation, including new principal spillway construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Dam rehabilitation including new principal spillway construction. Removal of the existing principal spillway, construction of new reinforced-concrete drop spillway, decommissioning of the auxiliary spillway and small fishing pond, embankment modifications, permanent stabilization and associated work items.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4,000 CY excavation sediment, 95 LF 24" dia. CMP drain pipe, 20 LF 8" dia. SCH 40 PVC drain pipe solid, 90.6 crushed rock roadway surfacing. See outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 23, 2026
Release: Jan 7, 2026
Close: Jan 23, 2026
4,000 CY excavation sediment, 95 LF 24" dia. CMP drain pipe, 20 LF 8" dia. SCH 40 PVC drain pipe solid, 90.6 crushed rock roadway surfacing. See outside link.
AvailableThe project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Close: Feb 27, 2026
The project generally consists of construction of a new low-level outlet works structure and emergency spillway channel. Strip and stockpile topsoil and incidental grubbing. Demolition and site preparation. Embankment excavation. Borrow and place embankment fill. Furnish and place aggregate base course. Furnish and place 12" D50 riprap. Furnish and install 12"-diameter PVC outlet pipe and pipe cradle. Furnish and install outlet works precast concrete intake structure, outlet works manhole, and outlet structure.
AvailableWork consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Posted Date
Sep 20, 2022
Due Date
Oct 11, 2027
Release: Sep 20, 2022
Close: Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →